How to 100% pass C_TSCM52_67 exam? Lead2pass provides the guaranteed C_TSCM52_67 exam preparation material to boost up your confidence in C_TSCM52_67 exam. Successful candidates have provided their reviews about our C_TSCM52_67 dumps. Now Lead2pass supplying the new version of C_TSCM52_67 VCE and PDF dumps. We ensure our C_TSCM52_67 exam questions are the most complete and authoritative compared with others’, which will ensure your C_TSCM52_67 exam pass.

Following questions and answers are all new published by SAP Official Exam Center: http://www.lead2pass.com/c-tscm52-67.html

QUESTION 121
You create a purchase order for a foreign vendor. In what language are messages for this purchase order printed?

A.    In the language in which you are logged on to the system
B.    In the language defined in the vendor master record
C.    In the language of the purchase order header
D.    In the language defined in the output determination Customizing settings

Answer: C

QUESTION 122
You want to create a purchase order for a valuated material.
Which views in the material master record must be available as a minimum? (Choose two.)

A.    Purchasing
B.    Accounting
C.    General Plant Data/Storage
D.    Basic Data

Answer: AB

QUESTION 123
Which procurement elements can be generated in the material requirements planning run for a material that is procured only externally? (Choose three.)

A.    Planned orders
B.    Purchase requisitions
C.    Schedule lines
D.    Purchase orders
E.    Production orders

Answer: ABC

QUESTION 124
What can an MRP area include? (Choose three.)

A.    One plant
B.    Multiple plants
C.    Multiple storage locations of a plant
D.    One subcontractor
E.    Multiple subcontractors

Answer: ACD

QUESTION 125
Which times belong to the replenishment lead time in the planning run for an externally procured material? (Choose three.)

A.    Purchasing processing time
B.    Planned delivery time
C.    Requirement lead time
D.    Goods receipt processing time
E.    Minimum remaining shelf life

Answer: ABD

QUESTION 126
You perform a total planning run for a plant. On the initial screen, you can select a creation indicator for MRP lists. Which of the following can determine whether an MRP list is created for a material?

A.    Procurement type
B.    Exception message
C.    MRP type
D.    MRP controller

Answer: B

QUESTION 127
During a physical inventory, the warehouse manager has decided to have the quantity of a material recounted for a physical inventory document. How is a recount processed in the system?

A.    The new count quantity is entered in the existing physical inventory document and the inventory
difference is posted.
B.    A new physical inventory document is created.
The new count quantity is entered.
When the inventory difference is now posted, all physical inventory documents still to be posted
for the material affected are deleted.
C.    A new physical inventory document is created with reference to the original document.
After the recount, the inventory difference for the old document is posted first, followed by the inventory difference for the new document.
D.    A new physical inventory document is created with reference to the original document.
The new count quantity is entered in the new physical inventory document and the inventory difference
is posted.

Answer: D

QUESTION 128
Which statuses are updated at header level in a physical inventory document? (Choose three.)

A.    Count status
B.    Adjustment status
C.    Delete status
D.    Physical inventory status
E.    Material status

Answer: ABC

QUESTION 129
What data is displayed in the list of inventory differences? (Choose three.)

A.    Book quantity
B.    Quantity counted
C.    Difference quantity
D.    Current plant stock
E.    Date on which the difference is to be posted

Answer: ABC
QUESTION 130
For which transfer postings can an accounting document be generated if the postings are made with a valuated material? (Choose two.)

A.    Transfer postings from GR blocked stock to unrestricted-use stock
B.    Transfer postings between plants that have the same company code
C.    Transfer postings from unrestricted-use stock to quality inspection stock
D.    Transfer postings between two storage locations of one plant based on a two-step procedure

Answer: AB

The SAP C_TSCM52_67 exam questions from Lead2pass are the most reliable guide for SAP exam. We offer the latest C_TSCM52_67 PDF and VCE dumps with new version VCE player for free download, and the newest C_TSCM52_67 dump ensures your exam 100% pass. A large number of successful candidates have shown a lot of faith in our C_TSCM52_67 exam dumps. If you want pass the SAP C_TSCM52_67 exam, please choose Lead2pass.

C_TSCM52_67 new questions on Google Drive: https://drive.google.com/open?id=0B3Syig5i8gpDZzlLY21ydFN6RTQ

2016 SAP C_TSCM52_67 exam dumps (All 207 Q&As) from Lead2pass:

http://www.lead2pass.com/c-tscm52-67.html [100% Exam Pass Guaranteed]